Data Centre Construction in 2026: Six Safety Risks You Can’t Ignore

Written by HammerTech Editorial Team | 30-Apr-2026 19:09:58

On most construction projects, there’s a rhythm.

Structure goes up. Trades follow. Systems get installed. Then commissioning begins.

But data centre construction demands more: from teams, systems, and safety.

You’ll have crews installing cable trays next to systems being energised. Commissioning teams testing equipment while other trades are still trying to finish their scope. Day shift hands over to night shift, and the site resets without ever really stopping.

It’s not just busy, it’s layered.

That’s where safety starts to get tested. And when systems are live and crews are still building around them, small gaps don’t stay small for long.

 

What's Inside

1. Speed and phased execution

2. Front-loaded planning

3. Workforce complexity and rotation

4. Repeatable and standardised delivery

5. Commissioning and energisation readiness

6. Owner expectations and reputation risk

Quick stats: data centre construction in 2026

The U.S. sits at the centre of the global data centre construction boom. This growth drives faster builds, denser systems and puts pressure on timely, safe delivery.

  • $48.18bn to $112bn: Expected jump (133 per cent) in U.S. market size from 2024 to 2030 (Precedence Research)

  • $258.56bn to $491.99bn: Expected jump (90 per cent) in global market size from 2025 to 2030 (Precedence Research)

  • 20.8 per cent: Growth in the Dodge Momentum Index (leading indicator of construction starts) in July 2025, driven largely by data centre projects (Dodge Construction Network)

  • Examples of data centre projects that entered planning in July 2025:

    • Fairview Connections Data Centre in New Cumberland, PA ($500m)

    • Jabil AI Data Centre in Salisbury, NC ($500m)

 

Why building data centres demands a different approach to site safety

Data centres concentrate risk in ways most construction projects don’t.

  • High-voltage systems

  • Dense mechanical and electrical infrastructure

  • Overlapping trades working in tight spaces

  • Continuous delivery cycles with no clean breaks

These factors exist on other projects.

But the combination and speed of them on mission critical sites changes how safety needs to be managed.

“You have a lot of people working in those environments at accelerated rates and long hours. So, those things put together create a very high risk environment.”

Michael Beadle
Senior Vice President, Operations – Mission Critical

 

 

1. Speed and phased execution

The challenge

Data centres are built in phases, but those phases run into each other.

One area is being energised while another is still under construction. Prefabrication speeds up installation, but it also means multiple workstreams land on site at the same time.

You don’t get separation. You get overlap.

"These data centres are almost always delivered in phases. It takes a huge coordination effort. You’re building while working around very expensive, live equipment.” 

Mike Mizer
Senior Superintendent
 

 

What does this mean for safety?

The exposure comes from how work interacts.

An electrical team might be operating under a valid permit. A mechanical crew might be following their RAMS. Both are working correctly within their scope.

But when those scopes share the same space, the risk changes.

That’s where coordination becomes a safety control.

Permits, isolations, and work approvals need to be visible across trades, not just within them. If coordination breaks down between teams, work doesn’t just become unsafe. It slows, stops, and must be re-sequenced.

 

2. Front-loaded planning

The challenge 

Data centre construction is simply too complex to rely on reactive planning.

Detailed RAMS and SPAs are developed early. Work sequences are mapped out. Dependencies between trades are agreed before mobilisation.

Everything looks aligned at the start.

"All safety programmes, RAMS, and high-risk activities are submitted, reviewed, and approved before work can start.

Getting that information reviewed and approved before work begins is critical. Poor-quality SPAs have been a root cause behind many of the issues we’ve seen.” 

Rick Zellen Jr.
Senior Safety Director

 

What does this mean for safety?

Plans don’t stay static once work begins.

Sequencing shifts. Access changes. Crews adapt to keep progress moving. But the original RAMS often stays exactly as it was approved.

That’s where gaps form.

Teams that manage this well build review into the workday:

  • RAMS and SPAs are checked before work starts

  • Toolbox Talks focus on what’s happening today

  • Changes are course corrected early, not after an incident

Because by the time issues show up in the field, the opportunity to fix them without disruption has usually gone.

 

3. Workforce complexity and rotation

The challenge

Data centre sites bring together large, specialised workforces that don’t stay static.

Subcontractors move in and out. Crews rotate across shifts. Specialist trades are brought in for short, high-risk scopes.

The makeup of the site changes constantly.

"On most data centre projects, you’re managing trade partners rather than self-performing the work. Establishing a clear source of truth for how the project is run is one of the biggest challenges.” 

Rick Zellen Jr.
Senior Safety Director
 
 

What does this mean for safety?

Visibility becomes critical.

Site teams need to know:

  • Who is on site right now

  • What they are qualified to do

  • Whether they’ve completed the required induction and safety submittals

Without that, decisions are based on assumptions.

Someone looks experienced. A crew has “done it before”. A supervisor assumes training is current but new crews need access to safety submittals too so they can get caught up straight away.

Those assumptions hold until they don’t. Clear, accessible workforce data allows teams to focus on managing risk, not verifying basics.

 

4. Repeatable, standardised delivery

The challenge 

Data centres are one of the most repeatable project types in construction. Similar layouts, systems, and client expectations.

“Data centre work is very much rinse and repeat. The standards, the documentation, the way projects are handed over is very consistent. So, the more data we can capture and use, the easier it is for the next team.” 

Michael Beadle
SVP, Operations – Mission Critical

What does this mean for safety?

The same risks show up repeatedly. Congestion between trades. Pressure during commissioning. Access constraints in high-density areas.

None of it is new. The difference is whether those risks are carried forward as learning. Without that continuity, teams on each projects have to spend time and energy addressing the same challenges.

Teams that improve treat safety processes as something that evolves:

  • RAMS are refined based on real project experience

  • Common issues are addressed and corrected before the next project

  • Workflows are repeatable and standardised across sites

 

5. Commissioning and energisation readiness

The challenge 

Commissioning sees systems go live, testing ramps up, and multiple teams converge on the same areas to meet handover deadlines. There is zero room for delay.

Commissioning is where schedule pressure peaks - and where small safety gaps carry the biggest consequences. 

What does this mean for safety?

Small issues carry more weight.

A missed isolation or unclear permit doesn’t just create risk. It can stop progress entirely. With the average cost of a data centre outage hovering around $9,000 a minute (Vertiv), delays during commissioning carry immediate financial impacts.

At this stage:

  • Permits need to be clear and accurate

  • LOTO procedures need to be verified, not assumed

  • Documentation needs to reflect actual site conditions and be referenced during site walks

If teams are chasing information or second-guessing approvals, the pressure moves straight back onto the field.

Structured, traceable workflows keep that pressure under wraps.

 

6. Owner expectations and reputation risk

The challenge

Data centre clients expect consistency across every project. They’re not just looking at outcomes but how those outcomes are achieved. And they expect visibility.

"Some of our larger data centre clients have very strict safety requirements. They expect a high level of compliance. Many owners want direct access. They want full visibility into what’s happening on site.”

Mike Mizer
Senior Superintendent
 

What does this mean for safety?

Safety performance needs to be demonstrated, not described.

That includes:

  • Clear records of inductions and training

  • Visibility into permits and high-risk work

  • Instant transparency into overall safety performance

When that information is easy to access, conversations with owners stay straightforward.

When it isn’t, teams end up reconstructing what happened after the fact. That’s where confidence starts to slip.

 

Practical takeaways for mission critical site teams 

The same patterns show up across most data centre projects.

Teams that stay in control tend to focus on a few fundamentals:

  • Keep safety information current as outdated plans create blind spots

  • Make work visible across trades as coordination reduces overlap risk

  • Verify workforce readiness daily, not just when onboarding

  • Review plans against real conditions i.e. before work starts, not after issues arise

  • Standardise what works and carry it forward to the next project

None of this is new.

The challenge is doing it consistently when the job doesn’t slow down.

 

Conclusion: safety that keeps pace on data centre sites

Data centre construction doesn’t give you time to catch up.

Work moves quickly. Conditions change constantly. Multiple teams operate in the same space, often around live systems.

Safety needs to move at the same pace.

“There are more people, more density, and less time than we’ve ever had before. We need to help our teams focus on the most important things.”

Michael Beadle
SVP Operations – Mission Critical
 

That means staying connected to what’s happening on site, not just what was planned at the start. It means visibility across teams, clarity around high-risk work, and processes that hold up under pressure.

Because on these projects, the gap between plan and reality is where risk builds.

Closing that gap is what keeps teams safe.

 